§
Sovereign.Software
↓ .MD

← The Sovereign Software Index

Scientific Computing & GIS

GRASS GIS

Geospatial analysis system with a scriptable command set and its own on-disk database layout.

1. Overview

Geospatial analysis system with a scriptable command set and its own on-disk database layout.

Category: Scientific Computing & GIS.

2. Version and scope assessed

Version assessed: Pinned evidence 09ad2796fff4fdfc2a3bee8446868f8be3076db4.

3. Overall determination

Computing determination

4. Principle profile

Principle findings for GRASS GIS
OrderPrincipleFinding
ISovereigntyNot assessed
IILongevityNot assessed
IIILocality✓ Meets
IVTransparency and ControlNot assessed

5. Fundamental requirements

Fundamental requirements for GRASS GIS
RequirementStatus
E1 Independent access to essential information? Not Verified
E2 Practicable exit and migration? Not Verified
E3 Independent interpretation and recovery? Not Verified
E4 Continuing authority and custody over already-created work✓ Pass
E5 Governability of consequential actions? Not Verified

6. Evidence and verification

7. Migration and recovery

Native storage format: Project, mapset, and raster/vector directories on disk.

Synchronization or runtime model: Local desktop and command line.

Example export or inspection command (not verified against any particular version or data set): ls ~/grassdata/location/PERMANENT

8. Architectural strengths

Established strengths and their scope are recorded in the evidence and assessment findings on this page.

9. Architectural limitations

10. Assessment findings and remaining work

Evidence update: 23 October 2026

Assessment follow-up: These bounded findings are incorporated into the evidence above. Eligibility and principle ratings are deliberately unchanged; their reconciliation and any blank-status fixes are deferred to the next pass. Reproduction details and retained inputs are in evidence/third-pass/batch-10/.

Human-readable criteria: Can an independent party reproduce the analysis from preserved data, code, units, dependencies, and provenance, and exchange results without hidden loss?

Rating reconciliation: 24 October 2026

E3 and E5 remain Not Verified for the existing declared scope. Longevity and Transparency and Control are Not assessed pending their required minimums. Sovereignty is also Not assessed because the required access/exit/custody minimums are not all established. This is a targeted evidence decision, not a finding that the product fails. Existing E1, E4 and Locality findings were not re-certified.

Remaining: Pack/unpack equivalence, external database dependencies, raster/null/category fidelity, older-version opening and interrupted-write recovery remain untested. E5 needs mapset/processing/overwrite authority, effective removal scope and appropriate independent backup/restore boundaries.

Next without installing locally: Inspect synthetic native raster/vector packs, external DB references and expected attributes/CRS/null/category records; seek independent unpack comparisons and version-matched preview/remove/overwrite recovery evidence.

The individual decision and provenance are retained in evidence/rating-reconciliation/batch-10/. Overall: Insufficient evidence.

Contribute verification evidence for GRASS GIS

Have you tested clean-machine restoration, format migration, or failure rollback for GRASS GIS? We welcome reproducible laboratory logs, synthetic test fixtures, and independent assessments to resolve open findings.

Read the evaluation protocol · Submit verification records on GitHub

Individually reconciled in rating batch 10 on 24 October 2026. E3/E5 remain Not Verified for explicit missing coverage; dependent unsupported findings corrected. Previously resolved questions are retained, not counted again. E1/E4/Locality were not re-certified by this targeted review. The assessment procedure is described in the methodology.